35 Ellis

I-35E from US 77 south to US 77 north – Waxahachie

Project Overview:

The I-35E project from US 77 south of Waxahachie to US 77 north of Waxahachie widened this highway from four to six lanes (three in each direction). The contract to construct this project was awarded on Aug. 5, 2015, to OHL USA, Inc.

Services Performed by Team Members from 1836:

  • Construction Engineering & Inspection (CEI)
  • Construction Material Testing (CMT)
  • Cross-training Inspectors and Technicians to be utilized in both roles

More Projects

35W-3A

I-35W Segments 3A of North Tarrant Express Project Overview: Segment 3A was a Design-Build project that included the construction of two managed lanes in each

I35-W Segment 3C

Project Overview: The $910 million project rebuilt 6.7 miles from just north of US 81/287 (Heritage Trace Pkwy) to Eagle Parkway in Denton County.  This

SH 360

SH360 Project Fort Worth District Project Overview: The SH 360 project was located in the Fort Worth District. This $340M project added two toll lanes

DFW Connector

Project Overview: The project, completed in collaboration with the Texas Department, used a design-build process, for the construction of the 8.4-mile initial phase of the