35W-3B

I-35W Segment 3B of North Tarrant Express

Project Overview:

Segment 3B of the North Tarrant Express Project was a regular Bid Build project and consisted of reconstructing the existing general purpose and frontage roads along I-35W and adding new managed lanes in the median. The $244 million project added auxiliary lanes along the general-purpose lanes between entrance/exit ramps and additional frontage roads were provided at distinct locations.  This 3.6 miles segment of I-35W, from north of I-820 to US 81/287, started construction in May 2013 with substantial completion in late 2016.

Services Performed by Team Members from 1836:

  • Construction Engineering & Inspection (CEI)
  • Construction Material Testing (CMT)
  • Cross-training Inspectors and Technicians to be utilized in both roles

More Projects

35W-3A

I-35W Segments 3A of North Tarrant Express Project Overview: Segment 3A was a Design-Build project that included the construction of two managed lanes in each

I35-W Segment 3C

Project Overview: The $910 million project rebuilt 6.7 miles from just north of US 81/287 (Heritage Trace Pkwy) to Eagle Parkway in Denton County.  This

SH 360

SH360 Project Fort Worth District Project Overview: The SH 360 project was located in the Fort Worth District. This $340M project added two toll lanes

DFW Connector

Project Overview: The project, completed in collaboration with the Texas Department, used a design-build process, for the construction of the 8.4-mile initial phase of the

Contact Us