Chisolm Trail

Chisholm Trail Section 6

Project Overview:

Section 6 of the Chisholm Trail Parkway consists of extending State Highway 121 (Chisholm Trail) from Fort Worth, Texas, south 13.1 miles, to Cleburne, Texas.  The $182M design-build project includes a divided two-lane tollway with passing lanes, ramps at proposed cross streets, and 19 bridges. The Design-Build project provided turnkey delivery of the $182 million Section 6 of the Chisholm Trail Parkway.

Services Performed by Team Members from 1836:

  • Served as Independent Quality Firm Manager (IQFM) responsible for all QA
  • Reviewed shop drawings, work drawings, and specifications and made recommendations
  • Testing and Inspection of drainage elements, illumination, striping and signage, electronic tolling, intelligent transportation systems, fencing, utility relocation, guard rails, and landscaping.
  • Cross-trained Inspectors and Technicians to be utilized in both roles

More Projects

35W-3A

I-35W Segments 3A of North Tarrant Express Project Overview: Segment 3A was a Design-Build project that included the construction of two managed lanes in each

I35-W Segment 3C

Project Overview: The $910 million project rebuilt 6.7 miles from just north of US 81/287 (Heritage Trace Pkwy) to Eagle Parkway in Denton County.  This

SH 360

SH360 Project Fort Worth District Project Overview: The SH 360 project was located in the Fort Worth District. This $340M project added two toll lanes

DFW Connector

Project Overview: The project, completed in collaboration with the Texas Department, used a design-build process, for the construction of the 8.4-mile initial phase of the