I35-W Segment 3C

Project Overview:

The $910 million project rebuilt 6.7 miles from just north of US 81/287 (Heritage Trace Pkwy) to Eagle Parkway in Denton County.  This project added north and southbound managed lanes, widened and improved the existing lanes, and built continuous frontage roads along the 6.7-mile stretch of I-35W in northeast Fort Worth.

Services Performed by Team Members from 1836:

  • Reviewed drawings and specifications and provided comments and recommendations. 
  • Quality Assurance (QA)
  • Construction Material Testing (CMT)

More Projects

35W-3A

I-35W Segments 3A of North Tarrant Express Project Overview: Segment 3A was a Design-Build project that included the construction of two managed lanes in each

SH 360

SH360 Project Fort Worth District Project Overview: The SH 360 project was located in the Fort Worth District. This $340M project added two toll lanes

DFW Connector

Project Overview: The project, completed in collaboration with the Texas Department, used a design-build process, for the construction of the 8.4-mile initial phase of the

Chisolm Trail

Chisholm Trail Section 6 Project Overview: Section 6 of the Chisholm Trail Parkway consists of extending State Highway 121 (Chisholm Trail) from Fort Worth, Texas,

Contact Us