Location/Corridor: IH-820 & SH 183 – from IH 35W to SH 121
Project Length: 13 Miles
Highways Involved: IH-820, SH 183, SH 121
Construction Value: $414 Million
Scope of Services: Inspection and Construction Material Testing
Other info: Description The $414 million Capacity Improvement Project aims to enhance traffic flow by adding a free general purpose lane in each direction on the North Loop of I-820, along with a tolled managed lane on Airport Freeway (SH 183). Additionally, the project will involve modifications to certain ramps, connectors, and the pedestrian bridge in Hurst. 1836 is currently providing 2 full-time inspectors, and additional inspectors during HMAC placements and drilled shafts/micropile operations. 1836 is also performing construction material testing on soils, concrete, aggregate and HMAC for this project.