SH360 Project Fort Worth District
Project Overview:
The SH 360 project was located in the Fort Worth District. This $340M project added two toll lanes in each direction from approximately two miles south of I-20 near East Sublett Road/West Camp Wisdom Road to US 287. In addition, the project provided intersection enhancements and frontage road improvements to deliver continuous non-tolled frontage roads throughout the corridor. The project also added US 287 north and southbound main lane bridges over SH 360 and a portion of the US 287 northbound frontage road and ramps.
Services Provided by Team Members from 1836:
- Reviewed shop drawings, working drawings, and specifications and made recommendations
- Performed Owner Verification Testing and ensured QA test results were validating.
- Testing and Inspection of drainage elements, illumination, striping and signage, electronic tolling, intelligent transportation systems, fencing, utility relocation, guard rails, and landscaping
- Cross-trained Inspectors and Technicians to be utilized in both roles