SH 360

SH360 Project Fort Worth District

Project Overview:

The SH 360 project was located in the Fort Worth District. This $340M project added two toll lanes in each direction from approximately two miles south of I-20 near East Sublett Road/West Camp Wisdom Road to US 287. In addition, the project provided intersection enhancements and frontage road improvements to deliver continuous non-tolled frontage roads throughout the corridor. The project also added US 287 north and southbound main lane bridges over SH 360 and a portion of the US 287 northbound frontage road and ramps.

Services Provided by Team Members from 1836:

  • Reviewed shop drawings, working drawings, and specifications and made recommendations
  • Performed Owner Verification Testing and ensured QA test results were validating. 
  • Testing and Inspection of drainage elements, illumination, striping and signage, electronic tolling, intelligent transportation systems, fencing, utility relocation, guard rails, and landscaping
  • Cross-trained Inspectors and Technicians to be utilized in both roles

More Projects

35W-3A

I-35W Segments 3A of North Tarrant Express Project Overview: Segment 3A was a Design-Build project that included the construction of two managed lanes in each

I35-W Segment 3C

Project Overview: The $910 million project rebuilt 6.7 miles from just north of US 81/287 (Heritage Trace Pkwy) to Eagle Parkway in Denton County.  This

DFW Connector

Project Overview: The project, completed in collaboration with the Texas Department, used a design-build process, for the construction of the 8.4-mile initial phase of the

Chisolm Trail

Chisholm Trail Section 6 Project Overview: Section 6 of the Chisholm Trail Parkway consists of extending State Highway 121 (Chisholm Trail) from Fort Worth, Texas,